Maximum worklog range, per worker, with alert if exceeded
Set a threshold level for worklog assignment on a per worker basis. If level exceeded post an alert to manager or worker.
9
votes
declined
2 comments
-
Adminppolsinelli
(Admin, teamwork)
commented
Problematic as work is assigned on the entire task date range, but is probably done in spike; can work only if plan by day is used, but not many do that.
-
tlyster
commented
The idea is to set a maximum threshold for assigned work. That is, assign upto a maximum of 80% of my time leaving the remaining 20% for training, trouble ticket issue, etc. (overhead).