tlyster
-
2 votes
tlyster
gave this 2 votes
·
-
14 votes
tlyster
gave this 2 votes
·
-
6 votes
tlyster
shared this idea and gave it 3 votes
·
-
3 votes
tlyster
shared this idea and gave it 3 votes
·
-
5 votes
tlyster
gave this 2 votes
·
-
4 votes
tlyster
gave this 2 votes
·
-
9 votes
tlyster
gave this 2 votes
·
The idea is to set a maximum threshold for assigned work. That is, assign upto a maximum of 80% of my time leaving the remaining 20% for training, trouble ticket issue, etc. (overhead).